194/617
Building Technologies Division User Manual LMS14... CC1U7471en
6 The settings in detail 07.05.2014
6.9 Swimming pool
6.9.1 Setpoints
Line no. Operating line
2055 Setpoint solar heating
When making use of solar energy, the swimming pool is heated to this setpoint.
Note!
Function Collector overtemp prot can put the collector pump back into operation until
the maximum swimming pool temperature is reached.
Line no. Operating line
2056 Setpoint source heating
When using other heat sources, the swimming pool is heated to this setpoint.
6.9.2 Priority
Line no. Operating line
2065 Charging priority solar
Priority 1
Priority 2
Priority 3
Priority 1
Swimming pool charging has the first priority (before the buffer storage tank and the
DHW storage tank).
Priority 2
Swimming pool charging has the second priority (after the buffer storage tank or the
DHW storage tank).
Priority 3
Swimming pool charging is effected without priority (after the buffer storage tank, the
DHW storage tank, the heating circuits, and the consumer circuits).
Note!
Release and priority can also be influenced via inputs Hx.
Setpoint solar heating
Setpoint source heating
Charging priority solar