198/617
Building Technologies Division User Manual LMS14... CC1U7471en
6 The settings in detail 07.05.2014
Line no. Operating line
2136 Mixing valve Tn
By setting the right integral action time Tn, the control action of the mixing valve's
actuator is matched to the behavior of the plant (controlled system).
The integral action time influences the controller’s I-control action.
6.10.3 Plant hydraulics
Line no. Operating line
2150 Primary contr/system pump
Before buffer
After buffer
If the plant is equipped with a buffer storage tank, it must be entered here whether –
hydraulically speaking – the primary controller or the system pump is located upstream
of or downstream from the buffer storage tank.
Mixing valve Tn
Primary contr/system
pump