2 Getting Started “Configured Mode”
32
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Steps in Project Engineering
8. If the PC station is available online (local or remote), the next step is the initial configuration of
the station.
Note: To load the project engineering data locally, you must set the access point S7ONLINE for
the PC station to PC-internal (local).
Summary
In the “project engineering” step described here, the following activities were
explained:
1. Creating a STEP 7 project or using an existing STEP 7 project.
2. Creating a PC station in the STEP 7 project (NetPro / HW Config).
3. Inserting and networking PC modules in the PC station (HW Config/NetPro).
4. Creating applications (here the OPC server).
5. Creating the engineering data for connections between the applications.
6. Storing the project engineering data in an XDB database.
For offline mode, the XDB database is then available and can be used to import
the engineering data on the PC station.

Table of Contents

Other manuals for Siemens SIMATIC NET

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC NET and is the answer not in the manual?

Siemens SIMATIC NET Specifications

General IconGeneral
CategoryIndustrial Communication Software
ManufacturerSiemens
Operating SystemsWindows, Linux
Protocols SupportedPROFIBUS, PROFINET, OPC UA
CompatibilitySiemens PLCs, Third-party devices with supported protocols

Related product manuals