7 Example — OPC Application for Industrial Ethernet
90
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
7.5 Using the OPC Scout
7.5.1 Establishing a Connection to the Server
The OPC Scout as Client for Commissioning and Testing
You can now access the data objects of the S7 station with any OPC client. The
OPC Scout ships with this product as the tool for commissioning and testing.
Follow the steps below to read the inputs and set the outputs with the OPC Scout:
Activity
1.
Start the OPC Scout from the start menu:
(Start
"
SIMATIC
"
SIMATIC NET
"
OPC Scout).
2.
Double-click the “OPC.SimaticNET” entry to link the OPC Scout with the OPC Server.
The OPC Server is started.

Table of Contents

Other manuals for Siemens SIMATIC NET

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC NET and is the answer not in the manual?

Siemens SIMATIC NET Specifications

General IconGeneral
CategoryIndustrial Communication Software
ManufacturerSiemens
Operating SystemsWindows, Linux
Protocols SupportedPROFIBUS, PROFINET, OPC UA
CompatibilitySiemens PLCs, Third-party devices with supported protocols

Related product manuals