Commissioning and configuration of SIMATIC PCS 7
BOX RTX
7
7.1 Introduction
Introduction
The following sections contain the most important information on the configuration and
commissioning of SIMATIC PCS 7 BOX RTX.
Overview
The sections below describe the following configurations:
● Configuring SIMATIC PCS 7 BOX for a single-station system (Page 47)
You want to create a new project for the single-station system.
● Configuring SIMATIC PCS 7 BOX with external engineering (Page 57)
You want to create a new project for a BOX PC and expand the engineering station.
● Configuring SIMATIC PCS 7 BOX in the PCS 7 network (Page 72)
You want to expand an existing PCS 7 project with a BOX PC.
Configuring PCS 7 functions
The configuration of the process control system corresponds to the SIMATIC PCS 7 standard:
● Configuring the hardware components in HW Config
● Configuring the connections in NetPro
● Configuring the automation functions in CFC and SFC
● Configuring operator control and monitoring functions in WinCC
Time synchronization
You can find information about how to perform time synchronization of a BOX PC in the function
manual
Process Control System
PCS 7; Time Synchronization
.
Additional information
● Configuration manual
Process Control System PCS 7; Engineering System
● Configuration manual
Process Control System PCS 7; Operator Station
● Online help for
HW Config, NetPro, CFC, SFC
and
WinCC
● Manual
Process Control System PCS 7; Getting Started - Part 1
● Product information
SIMATIC; SIMATIC PCS 7 BOX RTX
BOX (V8.1)
Function Manual, 03/2015, A5E32711362-AC 45