Operation
6.6 Control via the operator panel
Converter cabinet units
300 Operating Instructions, 07/2016, A5E03347396A
Normalization for VECTOR object
Table 6- 6 Normalization for VECTOR object
Default for quick commissioning
p2000 = Maximum speed (p1082)
Reference voltage 100% = p2001 p2001 = 1000 V
p2002 = Current limit (p0640)
p2003 = 2 x rated motor torque
r2004 = (p2003 x p2000 x π) / 30
Reference modulation
100 % = Maximum output voltage without overload
Table 6- 7 List of signals for the operation screen - object B_INF
Scaling (100 %=...) See
table below
Factory setting (entry no.)
Temperature of power unit
Normalization for object B_INF
Table 6- 8 Normalization for object B_INF
Default for quick commissioning