Detailed description   
2.12 Block descriptions 
  Power Line Basic PLC Program (P3) 
2-164  Function Manual, 08/2005 Edition, 6FC5397-0BP10-0BA0 
 
CALL FB 11, DB 211 (//Brake test block 
  Start   :=M   111.0,  //Start brake test 
  Ack   :=E   3.7,  //Acknowledge error with Reset key 
  Bclosed  := I   54.0,  //Checkback signal, brake close 
controlled 
  Axis  := 3,   //Axis number of axis to be tested, Z 
axis 
  TimerNo  := T  110,  //Timer number 
  TV_BTactiv  := S5T#200MS,  //Monitoring time value: Brake test 
active DBX71.0 
  TV_Bclose  := S5T#1S,   //Monitoring time value: Brake closed 
  TV_FeedCommand  := S5T#1S,   //Monitoring time value: Travel command 
issued 
  TV_FXSreache  := S5T#1S,   //Monitoring time value: Fixed stop 
reached 
  TV_FXShold   := S5T#2S,   //Monitoring time value: Test time Brake
  CloseBrake  :=M   111.1,  //Request to close brake 
  MoveAxis  :=M   111.2,  //Request to initiate travel movement 
  Done  :=M   111.3,  //Test successfully completed 
  Error  :=M   111.4,  //Error has occurred 
  State  := MB  112);  //Error status 
 
OPEN "Axis3
"; 
//Brake test, Z axis 
O  M  111.3;  //Test successfully completed 
O  M  111.4;  //Error has occurred 
FP M 110.3;  
R  DBX  28.7;   //Request, PLC-monitored axis 
UN  DBX  63.1;   //Checkback signal, axis monitored by PLC 
V  M  111.0;  //Start brake test for FB 
V  M  110.7;  //Brake test running 
FP  M 110.4;  
R  M  111.0;  //Start brake test for FB 
R  M  110.7;  //Brake test running 
CALL "SpinCtrl" (//Traverse Z axis  
  Start   :=M   111.2,  //Start traversing motion 
 Stop  := FALSE,  
  Funct  := B#16#5,   //Mode: Axis mode 
  Mode   := B#16#1,   //Procedure: Incremental 
  AxisNo   := 3,  //Axis number of axis to be traversed, Z 
axis 
 Pos  := -
5.000000e+000,  
//Traversing distance: Minus 5 mm 
 FRate  := 
1.000000e+003, 
 //Feedrate: 1000 mm/min