2 - 1
Siemens AG SPR2-230.814.01 Page 1 of 14 SIREMOBIL Iso-C 3D
Medical Solutions Rev. 05 08.04 CS PS 24
Actions up to serial number 1408 2
• Proceed as follows after the SIREMOBIL Iso-C has been moved to the respective room
and the foot brake has been enabled.
Cover of the X-ray unit 2
• Remove the cover.
• Remove the protective conductor.
Cover of the horizontal carriage 2
If LITHOSTAR MODULARIS option is installed:
• Remove the cover (= 6 Allen screws) and pull connector M3.X1.
• Unscrew the protective conductor.
• Remove the brake assembly.
• The assembly previously removed has to be integrated into the new cover.
• Deinstall the cover plate. It will later be replaced by a new one (Fig. 1).
After the installation of the SIREMOBIL Iso-C 3D upgrade, the
external part of the docking plate must be reinstalled. Perform the
installation and setting of the switches as described in the
LITHOSTAR MODULARIS Service Instructions.
Fig. 1 Cover plate
NOTE