EasyManuals Logo

Simplex 4120 User Manual

Simplex 4120
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
3-7
Figure 3-7. Active List Screen changed to allow enabling or
disabling a point
2. At this screen, select the point you want and press Enable Point.
When you press Enable Point, the Point Enable Operation Window is displayed.
Figure 3-8. Point Enable Operation Window
3. At the Point Enable Operation Window, press Enable.
The Enable Operation Window is displayed and shows a count down timer that
indicates the time remaining before the point is enabled.
Continued on next page
Viewing Active Lists, Continued
Disabling/Enabling Points
(Continued)
firealarmresources.com

Table of Contents

Other manuals for Simplex 4120

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simplex 4120 and is the answer not in the manual?

Simplex 4120 Specifications

General IconGeneral
BrandSimplex
Model4120
CategoryNetwork Hardware
LanguageEnglish