EasyManuals Logo

Skyjack SJ16 Service Manual

Skyjack SJ16
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #132 background imageLoading...
Page #132 background image
132
213558ADA
SJ12, SJ16
Section 5 – Procedures Lift Cylinder Replacement
8. Raise the platform into position using the base
controls so the lower platform bolts can be
installed. Apply Loctite 242 (blue) to the threads
and install the lower 4 bolts. Torque to 30 ft-lb
(41 N·m).
Figure 68 Platform Lower Bolts Installation
9. Fully lower the platform.
10. Install the mast cover
Figure 69 Mast Cover Installation
11. Perform a full function test before putting
machine into service as outlined in 2.3
Specifications and Features - CE, AS of the
operating manual.
5.15 Lift Cylinder Replacement
CAUTION
A second person to assist will be required to
complete this procedure.
WARNING
Do not stand or pass under a suspended load.
To remove the lift cylinder from the machine, the
platform and mast assembly must be removed
first. Fully lower the platform and shut down the
MEWP before starting this procedure.
5.15-1 Extending Platform Removal
1. See 5.8-1 Extending Platform Removal for
platform removal.
5.15-2 Mast Assembly Removal
1. Remove the cover on the top of the mast.
Figure 70 Mast Top Cover Removal

Table of Contents

Other manuals for Skyjack SJ16

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ16 and is the answer not in the manual?

Skyjack SJ16 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Max Gradeability25%
Platform Height16 ft
Lift Capacity500 lbs
Machine Width0.76 m
Overall Width0.76 m
Drive Speed (Stowed)4.8 km/h
Drive Speed (Raised)0.8 km/h
Turning Radius (Inside)0 in
Power Source24V DC Electric

Related product manuals