Installation Workflow
WheninstallingtheStorEdgesystem,followthisworkflowtoensureallthecomponentsareconnected
andfunctioningcorrectly.
Step 1-PV system installation-modules,poweroptimizersandinverter:
l Poweroptimizers-asdescribedinInstallingthePowerOptimizersonpage10.
l Inverter-asdescribedinInstallingtheInverteronpage17.
Step 2-SolarEdge Auto-transformer and AC load panel installation (required for Backup Power
only):RefertoAuto-transformerandBacked-upLoadsPanelInstallation(forBackupOnly)onpage24.
Step 3- Electricity Meter installation (required for Smart Energy Management).RefertoElectricity
MeterInstallationonpage26.
Step 4-Connect the battery to the inverter and mount the battery
1
.Refertotheinstallation
informationinthemanufacturerdocumentation,andtoStorEdgeInverterConnectionsonpage27.
Step 5 - Connect all components to the inverter-connecttheautotransformerandloads(AC),PV
strings(DC),andmeter.RefertoStorEdgeInverterConnectionsonpage27.
Step 6 - Commissioning the inverter-Activatethesystemandpairthepoweroptimizers.Referto
CommissioningtheInstallationonpage55.
Step 7-Configuring the StorEdge application.RefertoConfiguringStorEdgeApplicationonpage65.
Step 8-Connecting communication between the inverter and monitoring portal.RefertoSettingUp
CommunicationtotheMonitoringPortalonpage71.
ThefollowingflowchartappearsthroughoutthisInstallationGuidetoassistwiththeinstallationsteps:
1
To gain better accessibility to the battery connection panel, it is recommended to connect the battery cables before
mounting it on the wall.
Chapter 1: Overview
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
9