13. Placetheferritebeadsonthewiresandclosethem.MakesuretheDClabeledferritebeadisplacedon
theDCwiresandtheAClabeledferritebeadisplacedontheACwires.
14. Closetheinvertercover.
15. ConfigurethesystemtotherequiredapplicationasdescribedinSystemConfigurationonpage62
16. PerformthecommissioningstepsasdescribedinCommissioningtheInstallationonpage55.
9V Battery Replacement
IfWarning8:Connection Unit Low 9V Batteryisdisplayedinthemainstatusscreen,replacethe9V
batteryintheStorEdgeConnectionUnit.
1. TurnOFFtheinverterON/OFFswitch,andwaituntiltheLCDindicatesthattheDCvoltageissafe
(<50V),orwaitfiveminutesbeforecontinuingtothenextstep.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five
minutes for the input capacitors of the inverter to discharge.
Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiq sur
l'écran LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient
chargés.
2. TurnOFFtheStorEdgeConnectionUnitandtheACswitchofthedistributionpanel.
3.
OpenandremovetheStorEdgeConnectionUnitcover.
4. Openandremovethetransparentinternalcover.
5. RemovethebatteryfromtheupperboardoftheStorEdgeConnectionUnitandreplacewithanew
standard9Vbattery.
6. ClosetheStorEdgeConnectionUnitcovers.
Figure 42: The battery holder
Appendix B: Replacing and Adding System Components