TheStorEdgesolutionrequiresconnectingameterforSmartEnergyManagementapplications,suchas
maximizingself-consumption.Forbackuppoweronly,installingameterisnotrequired.
ThemeterisconnectedtotheinverterusingRS485.
NOTE
The inverter RS485 bus should be connected to the battery and meter. Connecting multiple inverters
with RS485 master-slave connection requires an RS485 Expansion Kit (available form SolarEdge
Refer to http://www.solaredge.com/files/pdfs/RS485_expansion_kit_installation_guide.pdf).
ToinstalltheSolarEdgemeterrefertotheinstallationguidesuppliedwithit:
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide-na.pdf.
ForcommunicationconnectionrefertoConnectingCommunicationtotheMeteronpage37.