50
Unpacking and Inspection
• Unpacking the BMS and battery module(s) according to the following figures. If
there are other cartons, such as the base support carton, and series box carton,
the unpacking procedure can also be referred to the following figures.
1
2
3
Figure 5-2 Unpacking the BMS
1
2
3
Figure 5-3 Unpacking the battery module
• Unpacking a X3-Matebox G2 according to the following figure.
1 2
3
Figure 5-4 Unpacking X3-Matebox G2
• Be careful when dealing with all package materials which may be reused for
storage and relocation of the devices of X3-IES system and the matebox in the
future.
• Upon opening the package, check whether the appearance of the devices is
damaged or lack of accessories. If any damage is found or any parts are missing,
contact your dealer immediately.