58
Mechanical Installation
WARNING!
Only the qulalified personel can perform the mechanical installation following the
local standards and requirements.
Check the existing power cables or other piping in the wall to prevent electric shock
or other damage.
CAUTION!
Always be aware of the weight of the devices. Personal injuries may result if the
devices are lifted improperly or dropped while being transported or mounted.
Use insulated tools and wear individual protective tools when installing the devices.
NOTICE!
In the case of no more than 3 (including 3) battery modules in a tower, please ensure
that the bearing capacity of the supporting surface for the system must be over
940 kg.
In the case of 4 battery modules in a tower, please ensure the bearing capacity of the
supporting surface for the system must be over 1090 kg.
The devices must not be installed on the wood wall.
Please ensure that the thickness of any part of the wall should not be less than
150 mm if the wall mounting is selected.
At least two persons are required to move the devices of X3-IES system.
Please reserve enough distance from the device to the ceiling (or the grounding) for
capacity expansion.