Inspecting the Shipment
Receiving and Inspecting 4-3
Figure 4-3 Open crate showing laser head (top layer) and its cover (middle layer)
Protruding from the top of the mylar bag are three eye-bolts. These bolts can be used to
lift the laser using a forklift.
A forklift or a crane and sturdy cart should be available at the time of installation. The
installation engineer lifts the laser head and sets it on the cart for transportation to the
installation site.
Five more spring clamps hold the bottom section’s side cover in place. These are
released and the side cover is removed to access the laser cover (shown in
Figure 4-3).
After the laser is installed and operating properly at the desired location, the installation
engineer installs this cover on the laser and places warranty seals on the cover sides.
If there is no apparent damage to the laser or the laser cover, replace the crate cover and
wait for the Spectra-Physics installation engineer who will install your system.