OPERATION & MAINTENANCE MANUAL SWE18UF
58
In the first 100-hour or when work in mud, lubricate the pivot of working instrument every
other 8 hours’ operation.
4.2.3 After First 50 Hours of Operation
Carry out 50-hour operation maintenance. (refer to maintenance guide...fifty hours)
Check the torque of detectable fastener. (refer to the
torque specifications of fastener in the maintenance
part)
4.2.4 After First 100 Hours of Operation
Carry out 50-hour and 100-hour maintenance. (refer
to maintenance guide....50 hours and 100 hours)
4.3 OPERATING ENGINE
4.3.1 Daily Inspection
1) Electrical system
Check whether there are abraded or cracked wire and slack
connector or not, and check whether the light can be turned on or
off normally.
2) Boom, arm, bucket, dozer blade, sheet metal, track shoe
Check whether there are curving, damaged and lost parts or not.
3) Fastener
Check whether there are slack or lost parts or not.
4) Fuel system
Drain water and sediment from the fuel tank.
5) Hydraulic system
Check leakage, hose twist, abrasion between pipes and
hose or other parts.
6) Lubrication
Check the specified lubrication points listed in the
periodic maintenance table.