EasyManua.ls Logo

Suzuki RM85L - Front Fork Reinstallation

Suzuki RM85L
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FRONT FORK AND STEERING 16-11
REINSTALLATION
Reinstall the front forks.
Set the aligning line T on the outer tube to the upper surface
of the steering stem head.
Check that the air valve A is positioned at the front.
Tighten the fork lower clamp bolts 1 to the specified torque.
Fork lower clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Tighten the fork cap bolt 2 to the specified torque.
Fork cap bolt: 35 N·m (3.5 kgf-m, 25.5 lb-ft)
Tighten the fork upper clamp bolts 3 to the specified torque.
Fork upper clamp bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Install the front wheel. (14-4)
Install the brake caliper. (15-8)
Install the fork covers, brake hose guide and brake hose
cover.

Table of Contents

Related product manuals