EasyManua.ls Logo

Suzuki RM85L - Reassembly

Suzuki RM85L
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16-14 FRONT FORK AND STEERING
REASSEMBLY
Apply grease to the bearings and dust seals.
Install the steering stem, upper bearing and steering stem nut.
Tighten the steering stem nut with the special tool.
09940-14930: Steering nut socket wrench
Steering stem nut: 45 N·m (4.5 kgf-m, 32.5 lb-ft)
Move the steering stem right and left several times to seat the
bearings.
Turn back the steering stem nut by 1/4 to 1/2 turn.
Install the front forks temporarity to the steering stem.
Install the steering stem head and tighten the steering stem
nut temporarily.
Tighten the steering stem head nut to the specified torque.
Steering stem head nut: 65 N·m (6.5 kgf-m, 47.0 lb-ft)
Reassemble the front wheel and the brake caliper.
(14-3 and 15-8)
Reassemble the handlebars. Align the punched mark on the
handlebars with the mating surface of front side of the left
handlebar holder.
Set the punched mark (FWD mark) on the handlebar holders
as shown in the illustration.
Tighten the handlebar holder bolts to the specified torque.
NOTE:
First tighten the handlebar holder bolts
A
.
Handlebar holder bolt: 26 N·m (2.6 kgf-m, 19.0 lb-ft)
Reinstall the brake hose guide.
Rock the front fork forward and backward to ensure that the
steering has no play.
Inspect the steering for smooth movement so that the handle-
bars can move right and left under its own weight.
Reinstall the front number plate and the front fender.
NOTE:
When installing the front number plate, fit the holes
A
to the
steering stem’s projections
B
.
FWD
Punched mark
Clearance

Table of Contents

Related product manuals