EasyManua.ls Logo

Suzuki Vinson LT-A500F - Page 50

Suzuki Vinson LT-A500F
350 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-10
ENGINE
Tighten
the
muffler connection bolt
® to the
specified
torque.
H Muffler
connection
bolt: 23 N m (2.3 kgf-m, 16.5
Ib-ft)
Apply
THREAD LOCK
"1342" to the muffler mounting bolt
(2)
and tighten it to the specified torque.
tJ33
99000-32050:
THREAD
LOCK
"1342"
H Muffler mounting bolt: 23 N m (2.3 kgf-m, 16.5
Ib-ft)
After installing
the
engine, route
the
wire harness, cables,
and hoses properly.
(CCT
3
9-12 to 9-21)
Pour
3.0
L
(3.2
US
qt,
2.6
Imp qt)
of
an API
service classified
SF
or
SG
engine
oil
that
has
a
viscosity rating
of
SAE 10W/
40, into the engine after overhauling it.
Start
the
engine
and
allow
it to run for
a
few
minutes
at
idle
speed.
Turn
off
the
engine
and
wait about three minutes,
and
then
check the oil level
on
the dipstick.
WM Engine
oil
capacity
Oil change:
2.3 L (2.4 US qt, 2.0 Imp qt)
Oil
and filter
change:
2.5 L (2.6 US qt, 2.2 Imp qt)
Engine overhaul:
3.0 L (3.2 US qt, 2.6 Imp qt)
Adjust the following items
to
specification.
*
Throttle cable play
CIT
2-7
*
Engine
idle speed
2-8
*
Brake pedal
CU
5
2-15

Table of Contents

Related product manuals