EasyManua.ls Logo

TECO N310 Series - Maintenance and Inspection

TECO N310 Series
111 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Troubleshooting and maintenance
5-14
5.5 Maintenance and Inspection
Inverter doesn’t need daily inspection and maintenance.
To ensure long-term reliability, follow the instructions below to perform regular
inspection. Turn the power off and wait for the charge indicator (LED) to go out
before inspection to avoid potential shock hazard from the charge stored in high-
capacity capacitors.
(1) Clean up the accumulation of any dust inside the inverter.
(2) Check if there are any loose terminal screws and tighten them.
(3) Insulation tests
(a) Disconnect all leads connecting the INVERTER with external circuits when
performing insulation tests on external circuits.
(b) Internal insulation test should be performed against the main circuit of the
INVERTER body only. Use a high resistance DC 500V meter with
insulating resistance higher than 5M.
Caution! Do not perform this test against the control circuit.
Insulation Test Diagram

Table of Contents

Related product manuals