EasyManua.ls Logo

Thermo 48i - Setup Procedure

Thermo 48i
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Setup Procedure
Thermo Electron Corporation Model 48i Instruction Manual 2-3
6. Check that all connectors and circuit boards are firmly attached.
7. Re-install the cover.
Setup Procedure Use the following procedure to setup the instrument.
1. Connect the sample line to the SAMPLE bulkhead on the rear panel
(Figure 2-3). Ensure that the sample line is not contaminated by dirty,
wet, or incompatible materials. All tubing should be constructed of FEP
Teflon®, 316 stainless steel, borosilicate glass, or similar tubing with an
OD of 1/4-inch and a minimum ID of 1/8-inch. The length of the
tubing should be less than 10 feet.
Note Gas must be delivered to the instrument at atmospheric pressure. It
may be necessary to use an atmospheric bypass plumbing arrangement as
shown in Figure 2-4.
2. Connect the EXHAUST bulkhead to a suitable vent. The exhaust line
should be 1/4-inch OD with a minimum ID of 1/8-inch. The length of
the exhaust line should be less than 10 feet. Verify that there is no
restriction in this line.
3. If the optional zero/span solenoid valves are installed, connect a source
of CO-free air to the ZERO bulkhead, and connect a source of CO
span gas to the SPAN bulkhead.
4. Connect a suitable recording device to the rear panel connector. See the
“Operation” chapter for more information about the rear panel
pin-outs.
5. Plug the instrument into an outlet of the appropriate voltage and
frequency.
WARNING The Model 48i is supplied with a three-wire grounding cord.
Under no circumstances should this grounding system be defeated.

Table of Contents

Related product manuals