Thermo Electron Corporation Model 48i Instruction Manual 2-1
Chapter 2 Installation
Installing the Model 48i includes the following recommendations and
procedures:
• “Lifting” on page 2-1
• “Unpacking and Inspection” on page 2-1
• “Setup Procedure” on page 2-3
• “Startup” on page 2-5
Lifting When lifting the instrument, use procedure appropriate to lifting a heavy
object, such as, bending at the knees while keeping your back straight and
upright. Grasp the instrument at the bottom in the front and at the rear of
the unit. Although one person can lift the unit, it is desirable to have two
persons lifting, one by grasping the bottom in the front and the other by
grasping the bottom in the rear.
Unpacking and
Inspection
The Model 48i is shipped complete in one container. If there is obvious
damage to the shipping container when you receive the instrument, notify
the carrier immediately and hold for inspection. The carrier is responsible
for any damage incurred during shipment.
Use the following procedure to unpack and inspect the instrument.
1. Remove the instrument from the shipping container and set it on a table
or bench that allows easy access to both the front and rear.
2. Remove the cover to expose the internal components.
Equipment Damage Do not attempt to lift the instrument by the cover or
other external fittings.