12
-EN
Central Control Device (Touch Screen Controller) Installation Manual
Termination resistance setting
•RS-485 termination resistance setting ...................Set at both ends of the RS-485 communication line. Set one end at the main 
unit and the other end at the interface. The termination resistance of the main 
unit is already set as a factory default. Refer to the interface installation 
manual to set the termination resistance of the interface.
• LINK termination resistance setting.......................For the central control wiring (Uh line), set the two terminating resistors at 
both ends of the wiring between this Unit and the air conditioner to ON 
"Close" as much as possible.
Shield grounding process
•RS-485 cable wire shielded wire ......................... Connect to the FG terminal block.
• Central control wiring shielded wire .......................When using the system controller with one unit, open the shielded wire of the 
central control wiring and perform insulation processing. 
 
When using the system controller with multiple units, connect the shield of 
the central control wiring to the closed end and open the shield at the final 
end of the system controller to perform insulation processing.
 
Perform the central control wiring shield grounding on the air conditioner 
side.
• Be sure to install a circuit breaker or all-pole isolating switch (with a contact breaking distance of at least 3 mm) on the 
primary side of the power supply.
• Fasten the screws to the terminal block with torque of 0.5 N•m.
Central control wiring stripping length RS-485 cable wire stripping length Digital I/O cable stripping length
Attach a round crimp terminal to each wire of the power line and 
signal line.
Loosen the screws with a screwdriver, insert the digital I/O cable, 
and tighten the screws securely.