Manual VIPA CPU 21x Chapter 4 Deployment of the CPU 21x-2BT10 with TCP/IP
HB103E - Rev. 05/45 4-47
The project engineering is divided into the following steps:
• Hardware configuration
• CP Project engineering with NetPro
• PLC user application
• Transfer project
• Start Siemens SIMATIC Manager with new project.
• Place a new System 300 station with Insert > Station > SIMATIC 300
station and rename it to "Station 1".
• Activate the station "SIMATIC 300" and open the hardware configurator
by clicking on "Hardware".
• Configure a rack (SIMATIC 300 \ Rack-300 \ Profile rail).
• Engineer in deputy of your CPU 21xNET the Siemens CPU 315-2DP
with the order no. 6ES7 315-2AF03-0AB0 V1.2. which is to be found at
SIMATIC 300 \ CPU 300 \ CPU 315-2 DP \ 6ES7 315-2AF03-0AB0. If
needed, parameterize the CPU 315-2DP.
• Configure in deputy of your CP the CP 343-1 (343-1EX11) from
Siemens at slot 4, to be found at SIMATIC 300 / CP 300 / Industrial
Ethernet / CP 343-1.
• Set IP address, subnet mask and gateway at CP properties.
Here it is not necessary to configure the System 200V modules by means
of a virtual Profibus system.
Create, following the approach above, a hardware configuration for the
destination CPU and assign the name "Station 2".
For the CP, use the IP addresses, subnet masks and gateways assigned
to Station 2.
Save and compile your project.
Steps of project
engineering
Hardware
configuration
Station 1
Hardware
configuration
Station 2