EasyManua.ls Logo

ABB ACH580-31 - Page 125

ABB ACH580-31
284 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connect the phase conductors of the motor cable to the T1/U, T2/V and
T3/W terminals and the phase conductors of the input cable to the L1, L2
and L3 terminals.
If DC cables are present, use only two phase conductors and the ground
conductor. Connect the phase conductors to the UDC+ and UDC- terminals.
EMT
Tighten the screws to the torque given in the installation drawing below.
R3
7
7
7
8
8
L1, L2, L3, T1/U, T2/V, T3/W, UDC+, UDC-, PE (Ground): 1.7 N·m (1.2 lbf·ft)
Electrical installation North America (NEC) 125

Table of Contents

Other manuals for ABB ACH580-31

Related product manuals