The option code (A123) identifies information which concerns only a certain optional
selection. The options included in the drive are listed on the type designation label.
Quick installation, commissioning and operation flowchart
SeeTask
Type designation label (page 40)
Identify the frame of your drive: R3, R6 or R8.
Guidelines for planning the electrical install-
ation (page 57)
Plan the electrical installation and acquire
the accessories needed (cables, fuses, etc.).
Check the ratings, required cooling air flow,
input power connection, compatibility of the
motor, motor connection, and other technical
data.
Technical data (page 169)
Unpacking and examining delivery (page 47)
Unpack and check the drive.
Grounding system compatibility
check (page 93)
If the drive will be connected to an IT (un-
grounded) system or corner-grounded delta
system, check that the integrated EMC filter
and round-to-phase varistor are disconnec-
ted.
Mechanical installation (page 43)
Install the drive on a wall.
Routing the cables (page 75)
Route the cables.
Electrical installation IEC (page 91) or Elec-
trical installation North America
(NEC) (page 119)
Measure the insulation of the input cable and
the motor and the motor cable.
Electrical installation IEC (page 91) or Elec-
trical installation North America
(NEC) (page 119)
Connect the power cables.
26 Introduction to the manual