EasyManua.ls Logo

ABB ACH580-31 - Mechanical Installation; Necessary Tools; Unpacking and Examining the Delivery; Installing the Module

ABB ACH580-31
284 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Grounding screw1Motor thermistor connection5
60
61
PTC IN
PTC IN
One to six PTC thermistors connected in
series.
Hole for mounting screw2PTC connectionPTC IN60
Diagnostic LED6Ground (earth) potentialPTC IN61
Mechanical installation
Necessary tools
Screwdriver and a set of suitable bits.
Unpacking and examining the delivery
1. Open the option package. Make sure that the package contains:
the option module
a mounting screw.
2. Make sure that there are no signs of damage.
Installing the module
See section Installing option modules (page 115).
Electrical installation
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or
death, or damage to the equipment can occur.
Stop the drive and do the steps in section Electrical safety precautions (page 20)
before you start the work.
Necessary tools
Screwdriver and a set of suitable bits
Wiring
Connect the external control cables to the applicable module terminals. Ground
the outer shield of the control cables 360° under the grounding clamp on the
grounding shelf
CMOD-02 multifunction extension module (external 24 V AC/DC and isolated PTC
interface) 279