5. Measure that the installation is de-energized. If the measurement requires removal or
disassembly of shrouding or other cabinet structures, obey the local laws and regulations
applicable to live working (including but not limited to electric shock and arc
protection).
Before and after measuring the installation, verify the operation of the voltage tester
on a known voltage source.
Make sure that the voltage between the drive input power terminals (L1, L2, L3) and
the grounding (PE) busbar is zero.
Measuring holes of the standard drive are shown below.
L1, L2, L3
Make sure that the voltage between the drive output terminals (T1/U, T2/V, T3/W)
and the grounding (PE) busbar is zero.
Make sure that the voltage between the drive DC terminals (UDC+ and UDC-) and
the grounding (PE) terminal is zero.
6. Install temporary grounding as required by the local regulations.
7. Ask the person in control of the electrical installation work for a permit to work.
Additional instructions and notes
WARNING!
Obey these instructions. If you ignore them, injury or death, or damage to the
equipment can occur.
If you are not a qualified electrical professional, do not do installation or
maintenance work.
Keep the cabinet doors closed when the drive is powered. With the doors open, a risk
of a potentially fatal electric shock, arc flash or high-energy arc blast exists.
Make sure that the electrical power network, motor/generator, and environmental
conditions agree with the drive data.
Do not do insulation or voltage withstand tests on the drive.
Safety instructions 19