2 Installation and Commissioning
2.5.2. Installation of (optional) customer connections IRB 360
633HAC030005-001 Revision: -
© Copyright 2006 ABB. All rights reserved.
1. Dual press both shields, and connect them to earth.
2. Use green/yellow shrinking hose on free conductors, in both ends.
Installation
10.2 10 GY XP5 A10 4 R1.CS 20 15
11.1 11 BK XP5 B10 4 R1.CS 21 15
11.2 11 BU XP5 C10 4 R1.CS 22 15
12.1 12 BK XP5 D10 4 R1.CS 23 15
12.2 12 OG Conductor to cut off.
13.1 13 BK Conductor to cut off.
13.2 13 GN Conductor to cut off.
14.1 Conductor to cut off.
14.2 Conductor to cut off.
15.1 Conductor to cut off.
15.2 Conductor to cut off.
16.1 Conductor to cut off.
16.2 Conductor to cut off.
Shield XP5 Earth
Ref.
(DP
shield)
20 0V (Ground)
1)
Connection point A Connection point B
Wire Spec.
Des-
igna-
tion.
Term. Type
Des-
igna-
tion.
Term. Type Remark
Action Note
1 Remove the standard cover plate
2 Install the customer cable harness Use standard tools.
Continued