3 Maintenance
3.3.4. Vacuum System (optional)
3HAC030005-001 Revision: -82
© Copyright 2006 ABB. All rights reserved.
3.3.4. Vacuum System (optional)
General
This section describes maintenance on the vacuum system, with interval 500 and 4000 hour.
NOTE!
Only use un lubricated air.
DANGER!
Turn off all electrical power, hydraulic and pneumatic pressure supplies to the robot!
Also read the safety sections:
• Safety risks related to pneumatic/hydraulic systems on page 18
• Risks associated with live electric parts on page 20
• Safety risks during installation and service work on robot on page 15
Vacuum System
xx0700000499
A Air filter inlet.
B Ejector Unit
C Air filter inlet vacuum.
D Swivel Cup
E Hose Clamp
Continues on next page