EasyManua.ls Logo

ABB IRB 930 - Page 504

ABB IRB 930
606 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Screws: Hex socket head cap
screw M6x20 12.9 Gleitmo
603+Geomet 500 (4 pcs)
Refit the motor and refit the timing belt to the
motor.
Ensure that the belt runs correctly in the grooves.
3
Washers: Spring washer, conical
11x5.3x1.2 Steel (4 pcs)
Refit the screws and washers without fully
tightened.
4
Tightening torque: 10 Nm ±10%
xx2300000512
Refitting the protection tube
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Screws: Hex socket head cap
screw M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the protection tube.2
Secure the screws on the protection tube to the
inner arm.
3
Tightening torque: 1 Nm
xx2300000513
Continues on next page
504 Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.1 Replacing the axis-1 gear unit sub-assembly
Continued

Table of Contents

Other manuals for ABB IRB 930

Related product manuals