EasyManua.ls Logo

ABB SCK - Page 212

ABB SCK
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
212 Operating instruction SCK Gas Sampling System OI/SCK-EN Rev. E
Step
Procedure
9
Close vent cock on heat exchanger, screw on cap.
10
Open shut-off valve
-J63
again slowly and observe cooling-
water pressure display on the touchscreen. Fill cooling water to
a pressure of 1-1.5 bar (1000-1500 hPa).
Note: It is advisable for two people to do this job.
11
Switch the cooling-water pump
-M51
on again at motor breaker
-F37
or circuit breaker
-F36
.
12
Close control cabinet again.
13
Turn service switch back to
OFF
position and insert probe
again using the controller.
WARNING! Probe moves into the kiln. Do not stand in the area
of travel of the probe or probe carriage until the probe is
completely inserted into the kiln and the warning lamps go
out.

Table of Contents

Other manuals for ABB SCK

Related product manuals