7 Maintaining the Packed Column Inlet
To Install a Packed Glass Column
116 Maintaining Your GC
7 Simultaneously insert the column into the inlet and detector fittings but do not force it. It
may be necessary to start the long end of the column in the inlet at an angle to clear the
oven floor.
8 Withdraw the column 1 to 2 mm from both the inlet and detector. Finger-tighten both
column nuts.
Overtightening the column nut or forcing it to bottom in either the inlet or detector may
shatter the column.
9 Tighten both column nuts 1/4 turn with a wrench.
10 Configure the new packed column (make sure either column length or diameter is zero).
11 Establish a flow of carrier gas and purge as recommended by the packing manufacturer.
Generally:
• 20 to 30 mL/min for 2-mm id glass or 1/8-inch od metal columns
• 50 to 60 mL/min for 4-mm id glass or 1/4-inch od metal columns
12 After the GC becomes ready, wait 10 minutes then ignite the detector flame.
Be careful! The oven, inlet, and/or detector may be hot enough to cause burns. If the oven,
inlet, or detector is hot, wear heat-resistant gloves to protect your hands.
13 Allow the oven, inlet, and detector to equilibrate at operating temperature, then retighten
the fittings.
14 The GC maintenance wizard will perform checks at the appropriate times, including Leak &
Restriction tests, and will automatically reset the maintenance counters.
15 Select Finished, then select OK to exit the GC maintenance wizard.
16 Restore the analytical method.