Rockwell Automation Publication 1560F-UM001A-EN-P - June 2019 69
Chapter 3
Commissioning Procedure
Preliminary Setup
1. Ensure the work area is clean and tidy. Pathways to main disconnect and
emergency stop push button must be clear and unobstructed.
2. The following test equipment is to be prepared for use:
• Test power supply, supplied with each controller
•Multimeters
• Hi-Pot tester (recommended) or insulation resistance tester
• Oscilloscope with memory (optional)
3. Complete drawing package and parts list.
4. Specification of project.
System Characteristics
Job Name:_________________________________ Job Number:
____________________________________
Rated Voltage:______________________________Rated Current:
____________S.F.:________________
Actual Motor Load
Load Type:Fan ____ Pump____ Conveyor____ Compressor____ Mixer___
___
Other________________________________________________
Constant Torque_________orVariable Torque ______________
Actual Motor Data:
__________________________________________________
Motor HP:
_________________________________________________________
Motor Rated Speed:
__________________________________________________
Motor F.L.A.:
_______________________________________________________