EasyManua.ls Logo

Alpitronic hypercharger HYC50 - 4.4. Electrical Installation

Alpitronic hypercharger HYC50
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HYC50 - Operation and Installation Guide
Version 2-2
Page 44 of 102
4 HYC50 installation and commissioning
All rights reserved. Reproduction of this document, even in part, is only permitted with the approval of alpitronic Srl.
4.4. Electrical installation
The dimensioning of the cables and the protective devices outside the HYC50 must be
carried out according to the local regulations and in compliance with the technical
specifications of the HYC50 according to the technical data in chapter 11.

Table of Contents