Test Results screenTest Results screen
In addition to the various parameters, the Test SetupTest Setup screen also contains the
Application toolbar and the navigation tabs for horizontal and vertical
navigation.
The Test ResultsTest Results screen is the last screen in the workspace. It generally
contains several pages, reflecting the progress of the test. Navigation buttons at
the top of the screen will allow you to switch between the pages and between
ports.
During a measurement, Measurement start time, Elapsed time, and Remaining
time of measurement are displayed in Navigation area. Remaining time of
measurement is not displayed if Stop function is set to Manual stopManual stop in Control
screen.
Time display during a measurement