•
Insert the pumping member pin unit.
CAUTION
THE STANCHION MUST SLIDE FREELY IN THE SLEEVE
WITHOUT RESISTANCE.
Filling oil
•
Place the sleeve in a vertical position.
•
Insert the pumping member pin unit
and tighten to the specified torque with
the Öhlins tool.
•
Insert the preload pipe.
•
Fill the fork so that any air bubbles trapped within are expelled.
Oil level: 110 mm (4.33 in) (from the sleeve
edge, without a spring and with preload pipe).
THE SLEEVE MUST BE PERFECTLY UPRIGHT IN ORDER
TO MEASURE THE CORRECT OIL LEVEL. THE OIL LEVEL
MUST BE THE SAME IN BOTH STANCHIONS.
Characteristic
Fork oil
530 cc (0.12 Uk gal) (for each stanchion)
RSV4 Factory a-PRC Suspensions
SUSP - 415