EasyManuals Logo

APRILIA RSV4 Factory a-PRC 2009 User Manual

APRILIA RSV4 Factory a-PRC 2009
521 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #477 background imageLoading...
Page #477 background image
•
Via the filler orifice on the expansion
tank, fill with the quantity of coolant
necessary to reach the FULL marking,
then refit the cap.
•
Start the engine, run at idle speed and
wait for the electric fans to activate (ap-
prox. 101 °C - 213 °F) then turn off the
engine and wait for it to cool.
•
With the vehicle standing vertically,
check the liquid level both in the radia-
tor and in the expansion tank and top
up if necessary.
Water pump
•
Drain the coolant.
•
Remove the pipe from the radiator.
•
Unscrew and remove the two screws
fastening the pipe to the engine.
•
Retrieve the gasket and replace with a
new component when refitting.
See also
Coolant replacement
RSV4 Factory a-PRC Cooling system
COOL SYS - 477

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the APRILIA RSV4 Factory a-PRC 2009 and is the answer not in the manual?

APRILIA RSV4 Factory a-PRC 2009 Specifications

General IconGeneral
BrandAPRILIA
ModelRSV4 Factory a-PRC 2009
CategoryMotorcycle
LanguageEnglish

Related product manuals