4.6.1 Processing of inspection requests
Line 32, Sub-line 01, Authorization level: C
The function can be enabled or disabled in two ways:
00 = Function disabled
01 = A warning message appears on the display when an
inspection is due. The machine can be run.
02 = A warning message appears on the display when an
inspection is due. The machine cannot be run.
Default value is 00.
4.6.2 Acknowledgement of inspection requests
Line 32, Sub-line 02, Authorization level: C
Used by service technicians to remove the warning message
and to zero the inspection request counter. After this, the error
message must be acknowledged.
00 = acknowledgement of inspection requests.
4.6.3 Counter type for inspection requests
Line 32, Sub-line 03, Authorization level: C
7KHLQWHUYDOVEHWZHHQLQVSHFWLRQVFDQEHGH¿QHGLQWZRZD\V
01 = counts the time for which the machine has been connected
to the power supply, regardless of whether or not the machine has
been working.
02 = Counts the number of programs run.
Default value is 01.
4.6.4 Limit for inspection requests
Line 32, Sub-line 04, Authorization level: C
Set the number of hours/programs run between inspection
requests.
0 - 9999.
Default value is 9999.
4.6.5 Counter for inspection request
Line 32, sub-line 05
Number of hours/programs to the next inspection request. This
value cannot be changed.
It is set to zero when an inspection request is acknowledged; see
line number 32, sub-line number 02.