EasyManuals Logo

Arjo Tornado User Manual

Arjo Tornado
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
14
2.5.2 Internal cooling (optional)
Internal cooling takes water from the tank and the standard water
supply.
This method is not recommended according to EN ISO 15883.
2.6 Inspection hole
2.6.1 Positioning of FD1800 and FD1810
The inspection hole is located in the front right corner of the
chamber.
Take off the front cover and remove the technical unit using a Torx
T10 screwdriver to access the inspection area.
1
001431
Figure 2. Inspection hole (1)

Table of Contents

Other manuals for Arjo Tornado

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Arjo Tornado and is the answer not in the manual?

Arjo Tornado Specifications

General IconGeneral
CategoryMedical Equipment
DimensionsVaries by configuration
WeightVaries by configuration
Power SourceMains
MobilityMobile

Related product manuals