EasyManua.ls Logo

Arjo Tornado - Internal Cooling (Optional); Inspection Hole; Positioning of FD1800 and FD1810

Arjo Tornado
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
2.5.2 Internal cooling (optional)
Internal cooling takes water from the tank and the standard water
supply.
This method is not recommended according to EN ISO 15883.
2.6 Inspection hole
2.6.1 Positioning of FD1800 and FD1810
The inspection hole is located in the front right corner of the
chamber.
Take off the front cover and remove the technical unit using a Torx
T10 screwdriver to access the inspection area.
1
001431
Figure 2. Inspection hole (1)

Table of Contents

Other manuals for Arjo Tornado

Related product manuals