EasyManua.ls Logo

Bailey Infi 90 - Maintenance Procedures

Bailey Infi 90
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
EQUIPMENT REQUIRED
I-E96-506B1 6 - 3
EQUIPMENT REQUIRED
Following is a list of tools and equipment required for the
maintenance procedures.
Antistatic vacuum.
Digital multimeter.
Flathead torque screwdriver (Newton meters/inch-pounds).
Four-inch flathead screwdriver.
16-inch flathead screwdriver.
Isopropyl alcohol (99.5% electronic grade).
Foam-tipped swab.
Eberhard Faber (400A) pink pearl eraser or equivalent.
Fiberglass burnishing brush.
Lint-free cloths.
Small needle nose pliers.
PREVENTIVE MAINTENANCE PROCEDURES
This section covers tasks from Table 6-1 that require specific
instructions or further explanation. The tasks and instructions
covered are:
Cabinet air filter cleaning or replacement.
How to check signal, power and ground connections.
Checking modular power supply outputs.
The power entry panel preventive maintenance procedure.
Specific instructions on cleaning printed circuit boards and
edge connectors.
Refer to Section 7 for instructions on how to replace the fan
assembly.
Cabinet Filter Cleaning/Replacement
The cabinet air filter mounts over the lower air vent, inside the
cabinet front door. To replace the air filter:
1. Use a flathead screwdriver to remove one screw securing
the mounting plate at the top of the air filter mounting bracket.
Replace power modules. Call Bailey sales and service for information. 5 years
Complete all checks and inspections in this table. Replacement tasks should be done
at the scheduled frequency.
Shutdown
Table 6-1. Preventive Maintenance Schedule
(continued)
Task Frequency
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Related product manuals