EasyManua.ls Logo

Baumuller b maXX 5500 - 8.4.4 POWERLINK

Baumuller b maXX 5500
316 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Instruction handbook b maXX BM5500, BM5600, BM5700
Document No.: 5.13008.10
229
of 314
8
8.4.4 POWERLINK
®
.
Type code b maXX BM5500, BM5600, BM5700 with POWERLINK
®
:
BM5XXX-XXXX-XXXX-04XX-
b maXX BM5500, BM5600, BM5700 devices can communicate with a POWERLINK
®
Managing Node via the fieldbus connection POWERLINK
®
.
X3 and X4 on the front side of the device are the RJ45 connections for POWERLINK
®
(also refer to ZController terminalson page 193).
Mounting and
installation
The mounting/installation consists of the following steps:
1 De-energize the b maXX BM5500, BM5600, BM5700 device
2 Set the b maXX BM5500, BM5600, BM5700 IP-address,
refer to ZSetting the IP address with address switchesfrom page 133
3 Connect b maXX BM5500, BM5600, BM5700 with Ethernet-connection cables.
n Please, observe an EMC-compatible laying of the Ethernet connection cables!
n The following cables were released for use by Baumüller:
Ethernet-connection cable;
Further information refer to ZAccessories Ethernet/EtherCAT
®
/VARAN/
POWERLINK
®
.on page 292.
Commissioning. The following preconditions must be fulfilled before commissioning:
1b maXX BM5500, BM5600, BM5700 with POWERLINK
®
is installed correctly.
n Ethernet-connection cables are wired correctly.
2 The control cabinet is properly locked and all safety devices are operating.
3 The b maXX BM5500, BM5600, BM5700 device is ready-to-use.
Address switch By means of the address switches S3 and S4 the last byte of the IP-address is set
(Refer to settings ZSetting the IP address with address switchesfrom page 133).
IP address 192.168.100.0 is not allowed.
Further information about the setting possibilities of the POWERLINK
®
Controlled Node
refer to „Application Manual“.
Parameters The parameter settings determine the behavior of the POWERLINK
®
Controlled Node in
operation. Parameters are set with the software ProDrive.
1 Start ProDrive
2 Click on „Project Tree“.
3 Communication settings with ProDrive
n Project Tree: Configuration/Fieldbus Slave
(refer also Parameter manual b maXX BM5500, BM5600, BM5700 )
m set Synchronization to „On“
m SYNC time = Fieldbus cycle time = POWERLINK
®
cycle time = 500 µs to 8 ms
This setting is not necessary if using the POWERLINK
®
profile and the POWER-
LINK
®
Managing Node sets a valid value in object 0x1006 „Communication cycle
period“.

Table of Contents

Related product manuals