Troubleshooting and fault correction
Instruction handbook b maXX BM4400, BM4600, BM4700
Document No.: 5.12008.07
243
of 358
9
P0204 Error in function or option modules
P0205 Error power supply
Error No. Meaning Reaction Troubleshooting
48 Error in function module A 3rd level
error
see ZError in function module A to E– on page 255 (=
3rd level)
49 Error in function module B
50 Error in function module C
51 Error in function module D
52 Error in function module E
53 Error in option module G
54 Error in option module H
55 Error in option module J
56 Error in option module K
57 Error in option module L
58 Error in option module M
59 Timeout when waiting for the RST signal of the
slaves
IS Restart b maXX 4000
60 CRC error in SPI transmission
Module f controller
adjustable Error indicates high EMC interferences; please reduce
these.
Contact Baumüller Nürnberg GmbH.
61 CRC error in SPI transmission
Controller f module
adjustable
62 to 63 reserved, not assigned = 0
Error No. Meaning Reaction Troubleshooting
64 Power supply failure adjustable Connect the power supply system
65 Phase failure IS Check if all phases are correctly connected and volt-
age-carrying
66 Undervoltage power supply,
BM4100 only
IS Assure the compliance with the power supply specifi-
cations (see ZRequirements to the energy supply /
supply system– on page 52)
67 Overvoltage power supply,
M4100 only
IS
68 Undervoltage 24 V IS
69 to 78 reserved, not assigned = 0
79 Power supply monitor - group error adjustable See ZError power supply monitor– on page 253 (= 3rd
level)