Chapter 5 Installation
Mini-Switch LB 471
5.1.3 Temporary Storage of Sources
The operator has to take suitable provisions for intermediate stor-
age of sources at the place of installation between the period from
source delivery to the start of the installation work. A source may
be stored only in a lockable room which is identified accordingly.
Accessible controlled areas have to be identified and, if necessary,
secured.
5.1.4 Installation Site
Risk of injury and damage!
Heavy system parts may fall down if not installed properly.
The carrying capacity of the container walls or the holders must be
adequate to install the source with shielding and the detector.
Free space must be foreseen at the installation site for:
Freedom of motion for delivery of shielding, detector and eval-
uation unit
Servicing and repair work, to install and dismantle parts.
The source with shielding and the detector are horizontally in-
stalled on the designated limit level on the outside of the container
and outside a possibly installed heat insulation. Any special fea-
tures at the measuring point have to be taken into account.
5.1.5 Unpacking and Cleaning System Parts
After unpacking, compare all parts with the packing list and check
if the shipment is complete and shows any sign of damage. If nec-
essary, you may have to clean parts.
If you detect any damage, notify the forwarder and the manufac-
turer immediately.