Installing the 6200 network element 5-3
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Fill empty slots in the chassis with respective filler panels. Filler panels serve
the following three important functions:
• They prevent exposure to hazardous voltages and currents inside the
chassis.
• They block electromagnetic interference (EMI) that might disrupt other
equipment.
• They direct the flow of cooling air through the chassis.
Do not operate the system unless all cards, power modules, and filler panels
are in place.
Chapter procedure list
Table 5-3 lists the procedures in this chapter, which you must perform to install
the 6200 network element.
Table 5-3
6200 installation procedures
Action Details
Installing the 6200 shelf Procedure 5-1
Connecting the 6200 to local safety ground Procedure 5-2
Connecting the DC power supplies Procedure 5-3
Connecting the AC power supply Procedure 5-4
Connecting the LAN and Craft cables Procedure 5-5
Connecting external synchronization interface (ESI) and alarm
cables
Procedure 5-6
Routing cables on the rack Procedure 5-7
Connecting fiber optic cables to STM-1/4/16 or OC-3/12/48
interfaces on 2.5G MRO card
Procedure 5-8
Connecting fiber optic cables to STM-1/16 or OC-3/48 interfaces
on 15G MRO XC card
Procedure 5-9
Connecting fiber optic cables to STM-4/16/64 or OC-12/48/192
interfaces on 60G MRO XC card
Procedure 5-10
Connecting and routing E1/DS1 cables Procedure 5-11
Connecting and routing 63xE1DS1WP cables through
IO63xE1DS1 card
Procedure 5-12
Connecting E3/DS3 cables to 6xE3DS3 interfaces Procedure 5-13