Installing the 6200 network element 5-3
6200 Packet-Optical Platform Installation, Commissioning, and Testing Procedures
Release 1.1 009-6200-201 Draft Issue 1
Copyright
©
2014 Ciena
®
Corporation September 2014
Fill empty slots in the chassis with respective filler panels. Filler panels serve
the following three important functions:
They prevent exposure to hazardous voltages and currents inside the
chassis.
They block electromagnetic interference (EMI) that might disrupt other
equipment.
They direct the flow of cooling air through the chassis.
Do not operate the system unless all cards, power modules, and filler panels
are in place.
Chapter procedure list
Table 5-3 lists the procedures in this chapter, which you must perform to install
the 6200 network element.
Table 5-3
6200 installation procedures
Action Details
Installing the 6200 shelf Procedure 5-1
Connecting the 6200 to local safety ground Procedure 5-2
Connecting the DC power supplies Procedure 5-3
Connecting the AC power supply Procedure 5-4
Connecting the LAN and Craft cables Procedure 5-5
Connecting external synchronization interface (ESI) and alarm
cables
Procedure 5-6
Routing cables on the rack Procedure 5-7
Connecting fiber optic cables to STM-1/4/16 or OC-3/12/48
interfaces on 2.5G MRO card
Procedure 5-8
Connecting fiber optic cables to STM-1/16 or OC-3/48 interfaces
on 15G MRO XC card
Procedure 5-9
Connecting fiber optic cables to STM-4/16/64 or OC-12/48/192
interfaces on 60G MRO XC card
Procedure 5-10
Connecting and routing E1/DS1 cables Procedure 5-11
Connecting and routing 63xE1DS1WP cables through
IO63xE1DS1 card
Procedure 5-12
Connecting E3/DS3 cables to 6xE3DS3 interfaces Procedure 5-13