EasyManua.ls Logo

Conquest Imaging GE Voluson E10 - Module 9 System Adjustments; Control Console Positioning; Control Console Rotation; Control Console Height Adjustment

Conquest Imaging GE Voluson E10
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Voluson E10 Training Manual
© 2017 Conquest Imaging
61
Module 8 Parts Replacement
This section provides procedures and information for replacing spare
parts on the E10 systems. Always follow the standard ESD and safety
procedures when replacing parts or modules. Pay close attention to
the part number when replacing parts:
Most parts are labeled with the part number.
Always replace like for like or check compatibility.
Visually inspect all parts before installing.
Some parts are different depending on BT level and/or SW.
System Layout
The following shows the basic layout of the Voluson E10 system:
Check the model number
and other vital
information before
ordering parts for the
system.

Table of Contents