Testing Mode
1-14 72A-1230 Rev. F
July 22, 2005
The following instructions describe how to assemble the components of the
M4000 Insulation Analyzer into the Testing Mode, from the Storage and
Moving Mode:
WARNING When preparing for a test, do not attach any test leads to the apparatus to
be tested without first attaching them to the M4100 test set!
1. With the M4300 Transport in the upright position, remove the M4200c
Controller Support frame, the Cable Carry bag, the Documentation bag,
the High Voltage Cable, and the Oil Test Cell from the rear of the
Transport.
2. Carefully lay the M4300 Transport down on its back on a level surface.
The handle should face the specimen to be tested.
3. Place the M4200c Controller Support frame into the tubes provided on the
M4300 Transport bottom plate, near the M4100 Instrument rubber feet.
The top of the frame must extend away or opposite to the handle.
4. Remove the M4200c Controller from the top surface of the M4100
Instrument. Place the M4200c Controller on the Support frame and lock it
in place.
5. Remove the top cover from the M4100 Instrument top panel. The M4100
Instrument is ready for connecting the cables.
6. The M4100 Instrument top panel receptacles are designed to only accept
the functionally correct cables. Place each cable into the respective
receptacle. The only interchangeable cables are the Safety Switches.
NOTE Inspect all cables for cracks or other damage before using.
7. Connect the Safety Ground cable to the M4100 Instrument, and to the
ground of the specimen to be tested. The Safety Ground Cable should be
the first connection to be made and the last one disconnected from the
M4100 Instrument.
8. Connect the M4100 Instrument and the M4200c Controller to the Power
Receptacle Box located at the bottom of the handle of the M4300
Transport. A separate receptacle box is also provided for cases where the
M4000 Insulation Analyzer is used away from the M4300 Transport. As
shipped from Doble, the 120 VAC receptacle in the M4200c Controller is
located under a yellow tag which states, “NOTICE: READ ENCLOSED
MICROSOFT SOFTWARE LICENSE BEFORE USING”. The license
agreement and documentation are in the Documentation bag. Please
comply with the notice and remove the tag to plug in the cable.
9. Interconnect the M4100 Instrument and the M4200c Controller using the
gray snap-in cable provided.