EasyManua.ls Logo

Eaton easy800

Eaton easy800
394 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Installation
2.9 Install SmartWire-DT
Control Relay easy800 11/11 MN04902001Z-EN www.eaton.com 67
2.9 Install SmartWire-DT
SmartWire-DT is only supported by easy800-SWD devices.
Connection SmartWire-DT
The ribbon cable is provided with direction arrows. Proceed as follows to
connect SmartWire-DT:
1. Prepare the ribbon cable or use a prefabricated cable
(see manual MN05006002Z-EN).
2. Fit the bus termination to the blade terminal to which the arrow in the
ribbon cable is pointing.
3. Finally check the correct polarity of the SWD stations:
All arrows provided on the SWD stations and ribbon cable must be
pointing in the same direction.
The black conductor of the ribbon cable must be on the same height
as the station‘s designation +15 V shown in black.
(see manual MN05006002Z-EN).
4. Hold the blade terminal from which the arrow on the ribbon cable is
pointing away.
5. Insert this blade terminal into the SWD-OUT socket.
Figure 65:Connecting the SWD system
Warning
SWD stations may be destroyed if they are refitted in the SWD
line when the power supply is on. Switch off the power supply
beforehand.
SWD4…LF
SWD4-8MF2

Table of Contents

Related product manuals