Two shutdown criteria are possible:
Shutdown of outlets after a set battery back-up time (After)
Shutdown of outlets at a given battery discharge level (if battery capacity under)
It is possible to specify values for both criteria. The first criterion reached will initiate server shutdown.
5.1.3.2 Sequential startup
It is possible to delay outlet power-on to reduce inrush currents on startup or to sequence the startup of several
devices.
Controlled outlet startup after a given time is based on startup of the main outlet.